A technological material speed to install

The structures of glued laminated timber are produced according to precise drawings that our designers define together with the customer. Each structural element is worked by CNC machines. This allows Canducci to deliver elements ready to be installed to the building site.
The installation of glulam structures is done without cribs, without the need to plaster or paint the structural elements, and without the use of false ceilings.
Comparing the installation time of glulam structures with those made of other materials, it is easy to grasp why the best solution is using timber.
It takes 30 days to install a roof made of reinforced concrete, while It takes only 3/4 days to install a wooden roof of a villa of 300-400 m2. The difference speaks for itself.
Timber is also preferred to steel for the realization of covering structures of large spans, since the fact that timber is not influenced by the effect of high temperatures and it has a better exterior aspect.

 

 